Ecosystem Roadmap
PTI governance MUST evolve as the implementer base, institutional adoption, and public scrutiny grow. This roadmap defines four phases from founding stewardship to a mature ecosystem. Timelines are indicative — phase transitions require published criteria, not calendar dates alone.
Phase overview
| Phase | Focus | Primary decision body | Success signal |
|---|---|---|---|
| 1 — Founder Stewardship | Establish RFCs, tests, reference impl | Appointed WG + Stewardship Council | v1.0 Stable; Core certification path |
| 2 — Partner Participation | Independent implementers, labs | WG + expanding CPB | ≥2 certified non-steward implementations |
| 3 — Community Governance | Elective leadership, public bylaws | Elected Maintainers + boards | Annual elections; transparency report |
| 4 — Mature Ecosystem | Neutral legal home, federation scale | Foundation board + WG | Foundation operating; trademark transferred |
Phase 1 — Founder Stewardship
Objective: Publish a coherent, certifiable PTI v1.0 and prove implementability.
Characteristics
- Working Group convened with Maintainers appointed by founding steward
- TumiTrust operates flagship reference implementation
- RFCs RFC-001 through RFC-012 reach Stable or documented path thereto
- Conformance Program publishes Core profile and tests
- Governance documents in this section published and maintained
Governance rules
- Rough consensus with appointed Maintainers; appeals to Stewardship Council
- Independent reviewer minimums SHOULD be met but may include steward affiliates with disclosure
- Trademark administered by steward per Trademark and Branding
Exit criteria (all required)
- Specification v1.0 bundle marked Current
- Self-assessment and pilot lab certification available
- Public RFC Process operating ≥6 months
- Phase 2 transition plan published
Indicative duration: 12–24 months from first public RFC bundle.
Phase 2 — Partner Participation
Objective: Demonstrate vendor-neutral adoption beyond the founding steward.
Characteristics
- ≥2 organizations run independent pilots using Build Your Own PTI
- Accredited labs certify implementations other than TumiTrust
- Enterprise profile tests available; federation pilots per RFC-006
- Partner institutions participate in WG plenary without fee
Governance rules
- Maintainers SHOULD include ≥1 non-steward affiliate
- ARB MUST include ≥1 independent implementer representative
- Stewardship Council publishes annual transparency report (funding, trademarks, WG appointments)
- Certification registry public
Exit criteria
- ≥2 active certificates held by non-steward implementers
- ≥12 months accredited certification operation
- Documented independent implementer council
- Supermajority WG vote to adopt Phase 3 election rules
Indicative duration: 18–36 months.
Phase 3 — Community Governance
Objective: Transfer substantive governance authority to elected community leadership.
Characteristics
- Maintainers elected by contributor electorate per Decision Making
- Board appointments include institutional user and public-interest seats
- Draft Future Foundation Model charter circulated for comment
- Major RFC work includes implementation reports from ≥2 vendors
Governance rules
- Steward MUST NOT hold majority of Maintainer seats
- Governance document changes require 28-day public comment
- Foundation formation exploratory committee chartered by WG
Exit criteria
- Two consecutive elected Maintainer terms completed
- Foundation legal entity formed OR binding hosted-standards agreement signed
- Trademark transfer plan approved
- Multi-year funding committed for foundation runway
Indicative duration: 24–48 months.
Phase 4 — Mature Ecosystem
Objective: Sustainable, neutral stewardship supporting global federation.
Characteristics
- Independent foundation (or equivalent) owns trademarks and test IP
- Multiple certified implementations in production federation
- Government and enterprise profiles widely certified
- TumiTrust continues as one reference implementer among many
Governance rules
- Board composition per Future Foundation Model
- Working Group operates under foundation bylaws
- Stewardship Council dissolved or purely advisory
- Public Governance Statement updated to reflect foundation
Ongoing obligations
- Maintain Stable RFC cadence and security disclosure
- Never reintroduce single-vendor specification capture
- Publish conformance and transparency reports annually
Cross-phase invariants
These MUST NOT regress across phases:
| Invariant | Document |
|---|---|
| RFC 2119 normative process for breaking changes | Breaking Changes Policy |
| Free RFC contribution | Contribution Process |
| Certification vendor neutrality | Conformance Program |
| Spec vs product separation | Specification vs Implementation |
| Subject-facing privacy and explainability in RFCs | RFC-009, RFC-012 |
Current status
As of publication: Phase 1 — Founder Stewardship.
The Working Group WILL update this page when exit criteria for Phase 2 are met, including links to transparency reports and certification registry snapshots.